Floor Surface Preparation
Prior to installation, the concrete surface must be fully cured and then washed with clean water to removed all excessive chemical materials used to cure the surface. All alkali, emulsifiers, oil substances and soap residue needs to be removed. Proper curing time will range from 30 to 60 days after the concrete installation.
Just before installation, the concrete surface must be thoroughly cleaned which should include sweeping, vacuuming and mopping to insure that all dirt, grease, oils, paints or any other contaminants which will prevent proper adhesion are removed.
Turf Preparation and Installation
The turf should be laid out unrolled to allow it to relax at least 1 hour before the actual installation. Ideal temperature for installation should be between 55° - 95° degrees Fahrenheit.
Also, the relative humidity should be between 10% - 65%. The turf should be pre-cut for each area allowing some excess for proper seaming,trimming and edging. |